Data Center Build - Exterior Infrastructure

The outdoor infrastructure is getting underway. Outside we have a new transformer pad, generator and ATS (Automatic Transfer Switch) pad, along with new natural gas run from the main just for the new high capacity generators.
POSTED BY Joshua Holmes IN GENERAL ON