The outdoor infrastructure is getting underway.  Outside we have a new transformer pad, generator and ATS (Automatic Transfer Switch) pad, along with new natural gas run from the main just for the new high capacity generators.

  • electric-pad-1
  • transformer-pad
  • transformer-1
  • natural-gas-1

Return

POSTED BY Joshua Holmes IN GENERAL ON